This seemed to be another one of those long days without a lot to show for my work. I made the tension rods that hold the baffle under the cylinders, I need to thread the ends of the rods and I need the 6-32 die so I will have to wait on these.
My spiral wrap finally arrived, it handle temperature better than the stuff I could find locally. I managed to clamp and wrap all of the electrical wires except the cylinder and exhaust temperature wires.
What took a good part of the day was designing the shelf to hold the GPS antenna. I finally came up with an idea and cut out the material before I had to call it a day.