KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  10-10-2012
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Riveted FAB, prepared for some glass work

Looking at the forecast it looks like tomorrow will be the last day of fairly warm weather, more than likely until spring and I thought I should get some of the last bit of fiberglass work I need to do done. After I riveted the top plate onto the air box I fit the cowl and cut the foam in the scoop for form the tunnel from the scoop inlet to the FAB inlet.

I have to lay up a new section of the empennage fairing so that it fits the curve of the horizontal stabilizer better. I am now ready to lay up some cloth if the weather cooperates tomorrow.
' style=





' style=




' style=

foam to close inlet ramp opening

foam to close inlet ramp opening

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.