KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  10-1-2012
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Baffle prep for primer

Well start of a new month, I have hopes of passing an Airworthy inspection by the end of the month or at least being ready for one! I began the day sanding the filter air box and applying some filler. My new oil lines came in so I gave them a loose test fit, it seems my measurements worked out and these will do fine.

I am trying to organize the spark plug wires and the EGT/CHT wires. I took an idea from someone on line and made clips that will go on the valve cover, the plug wire usually gets secured to one of the valve cover screws, this clip allows for another connection below the plug wires.

Last thing was to make a reinforcement angle for the connection between the two parts of the left aft baffle. After I was happy with this I took the baffle off to take it home to prime all the parts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.