Date:  3-4-2012
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Re-installed CB and Inst Panels

I spent a nice day with my bride but manage to get a few things done. I continued installing the forward baggage wall, I had to put terminals on the wires for the forward power port then hook back up all the parts that hang on the baggage wall. I then installed the right console, along with the switch and circuit breaker panels.

After sorting the wire harness into the correct position I have the instrument panel back in place. I don’t think I will hook everything in, since I only really need the EFIS/EMS to test the engine sensors, I should start some of that tomorrow.

NOTE: I realized I hit 2000 hours of build time today!!