KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  1-8-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Terminated more CB wires

I completed the wires on the back of the CB panel for all but the main instrument panel. I lace tied these wires. I then turned my attention to the eyeball lights that will go in the F804 caps. I needed to find a ground location. The wires have to go though the fixed sub-panel which I am not ready to rivet in place yet. I used D-sub pins to slice the wires so I can install and remove the sub-panel as much as I want as I test things.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.