KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  12-6-2010
Number of Hours:  4.25
Manual Reference:  
Brief Description:  Installed standoff

I refined the standoffs I made and then primed one after drilling for the nut plate. I had one wire that I miss routed so I untied some of the harness and ran the switch ground wire from the E&E bay up to behind the panel. This will be the ground for the airspeed switch on the trim system. After re-tying the wires I routed some wires around the top of the E&E bay there are a few items on a “Hot Battery Bus” and that is attached to the wall of the bay.

After riveting on the standoff I organized the wires running across the back of the panel. They were kind of all over the place; if I ever have to trace a wire in this bundle I want to be able do it with as little trouble as possible. I am just about ready to put connectors on the wires for the left sub-panel. I have a service loop in them and cut them to length. I want to get a light to use for the start arm switch; I would also like to replace the push button with one that has spade connectors and not screws.
' style=

Standoff riveted in place.

Standoff riveted in place.

' style=

You can see the standoff in action

You can see the standoff in action

' style=

Wires along the top to the Hot Batt bus

Wires along the top to the Hot Batt bus

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.