KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  7-15-2010
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Riveted on Map light mount

I riveted on the map light mount and then drilled a #19 hole in the rail for the wires. I then covered the wires with snake skin and some shrink tube where is transits the hole. I opened up the small tooling hole on the right side for a bushing like the left for wires to run. The last thing I messed with was route for wires to the eyeball lights.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.