KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  12-27-2005
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Routed rudder cables

Routed the rudder cables through the fuselage, installed cable fairings in on the front tunnel where cables exit to connect to pedals. The cable guides installed at the factory are different than those depicted in the drawings. They installed a bracket with a snap bushing. I may have a problem when I install the fuel valve, will decide then what action to take.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.