Brians RV-10 Construction
248 Logs Found 
 Date
Hours
Work Log Summary

Details

 11-30-2009
2.2
Instrument Training
Details
     

 08-01-2008
0.0
Painted!
Details
       

 06-30-2008
0.0
Trip to 52F (Glo-Custom) for painting!
Details
       

 06-23-2008
0.0
Flew to Piqua, OH to have Prop serviced
Details
       

 03-22-2008
1.0
N104BS Flies!
Details
     

 02-25-2008
6.0
NOSE WHEEL FAIRING
Details

 02-23-2008
8.0
PLACARDS & COWL DETAILS
Details

 02-21-2008
3.0
PITOT STATIC TRANSPONDER CHECK
Details

 02-17-2008
5.0
FINAL COWL DETAILS
Details

 02-15-2008
8.0
MISC FINISHING
Details

 02-10-2008
3.0
DOOR LATCH WARNING SYSTEM

 02-09-2008
3.0
RIGHT WINGTIP LENS

 02-05-2008
8.0
PILOT CONTROL GRIP & AILERON TRIM

 02-04-2008
6.0
INSTRUMENT PANEL LABELING

 02-03-2008
6.0
INSTALLED NOSE WHEEL FAIRING

 01-12-2008
8.0
MFD & MISC WIRING, SOFTWARE UPGRADED
Details
       

 01-10-2008
8.0
AUTOPILOT AND ANALOG INSTRUMENTS
Details
       

 01-09-2008
8.0
TRANSPONDER CONNECTIONS
Details

 01-07-2008
14.0
AVIONICS WIRING
Details
     

 01-05-2008
6.0
MISC ELECTRICAL
Details

 12-29-2007
4.0
PITOT & STATIC LINES
Details

 12-29-2007
2.0
FIRST ENGINE START!
Details
     

 12-15-2007
8.0
RIGHT WING ROOT FAIRING COMPLETED
Details

 12-08-2007
5.0
LEFT WING ROOT FAIRING COMPLETED
Details
       

 11-24-2007
8.0
INSTALLED RADIOS
Details
     

 11-17-2007
8.0
INSTALLED AND WIRED SWITCHES
Details

 11-01-2007
8.0
WIRING
Details

 10-29-2007
4.0
WING ROOT CONNECTIONS
Details

 10-27-2007
9.0
WING FINAL ATTACH
Details

 10-26-2007
8.0
WING ATTACH PREP
Details

 10-12-2007
6.0
UV SMOOTHPRIME APPLICATION
Details
       

 10-12-2007
6.0
LEFT WINGTIP LIGHTS & WIRING
Details
       

 10-10-2007
30.0
APPLIED THE LAST OF THE FILLER!
Details

 10-06-2007
5.0
RIGHT FLAP ATTACH
Details
     

 10-05-2007
6.0
LEFT FLAP ATTACH
Details
       

 09-24-2007
3.0
PREPARING THE INSTRUMENT PANEL
     

 09-15-2007
30.0
MOVING TO THE AIRPORT
Details
       

 09-06-2007
10.0
TRANSITION TRAINING WITH MIKE SEGAR
Details
       

 07-19-2007
10.0
INSTRUMENT PANEL PLANNING
Details
     

 07-14-2007
2.0
Windscreen Fairing
Details
       

 07-14-2007
6.0
ASSEMBLED RADIO STACK
Details
       

 07-07-2007
4.0
Pinpoint GADAHRS Bracket
Details
       

 07-04-2007
7.0
Windscreen Base Fairing
Details

 07-03-2007
3.0
Windscreen Microbaloon Fillet
Details
       

 05-06-2007
6.0
Ailerons, Flaps, Pitot
Details
       

 05-04-2007
16.0
Wing Skins
Details
       

 05-03-2007
8.0
Right Wing Bottom Skin
Details
     

 04-26-2007
8.0
Fitting Doors & Windows
Details
       

 04-22-2007
4.0
Cowling
Details
       

 04-21-2007
4.0
Cowling
Details
       

 04-20-2007
4.0
Cowling
Details
       

 03-24-2007
5.0
QB Wing Assembly
     

 03-22-2007
6.0
QB Wing Assembly
       

 03-21-2007
6.0
QB Wing Assembly
       

 03-20-2007
6.0
QB Wing Assembly
       

 03-19-2007
6.0
QB Wing Assembly
       

 02-26-2007
2.0
TT Pitch Servo
Details
       

 02-25-2007
6.0
Wing Conduit and Roll Servo
Details
       

 02-24-2007
4.0
Autopilot Pitch Servo
Details
       

 01-19-2007
4.0
FlightLine Interiors Front Seats
Details
     

 01-14-2007
5.0
Empennage Fairing
     

 01-13-2007
6.0
Rudder Attach
Details
       

 01-13-2007
4.0
Power Runs
Details
       

 01-13-2007
4.0
ELT Installation
Details
       

 01-13-2007
3.0
Battery & Stobe Power Supply
Details
       

 01-07-2007
4.0
Wiring/Setting Trim System
       

 12-21-2006
20.0
Empennage Attach
Details
       

 12-03-2006
4.0
HS to Fuselage Fairing
Details
       

 12-02-2006
3.0
Fairing Work
Details
       

 12-01-2006
4.0
HS Tips
Details
       

 11-11-2006
5.0
Attaching Fairings
Details
       

 11-11-2006
5.0
Attaching Fairings
Details
       

 11-02-2006
30.0
Cowl Baffling
Details
       

 10-05-2006
4.0
Cowl Side Hinge - Left
Details
       

 09-30-2006
8.0
Cowling Work
Details
       

 09-23-2006
6.0
Pilot's Door
Details

 09-22-2006
4.0
Left Rear Window Installed
Details
       

 09-16-2006
1.2
RV-10 Transition Training w/ Mike!
Details
     

 09-16-2006
8.0
Passenger Door Assembly
Details

 09-13-2006
2.3
RV-10 Transition Training w/ Mike
Details
       

 09-10-2006
6.0
Passenger Side Door
Details
       

 09-09-2006
7.0
Pilot Side Door
Details
       

 09-07-2006
1.0
EIS Returned from GRT
Details
     

 09-03-2006
10.0
Upper Cowl
Details
       

 08-26-2006
6.0
Spinner Assembly
Details
       

 08-25-2006
5.0
Spinner Assembly
Details
       

 08-22-2006
3.0
Engine Baffling
Details
     

 08-20-2006
4.0
Throttle & Mixture cables
Details
       

 08-19-2006
3.0
GRT EIS EGT & CHT PROBES
Details
     

 07-25-2006
4.0
Tailcone Fwd Top Skin
Details
       

 07-16-2006
2.0
SERVICE BULLETIN SB 06-2-3
Details
       

 07-16-2006
5.0
HS & Elevator Fiberglass Tips
Details

 07-16-2006
3.0
FLOSCAN and CABIN HEAT
Details
       

 07-12-2006
2.0
Bogert Bar and Nose Gear Fairing Spacers
Details
       

 07-10-2006
2.0
Hartzell Prop Arrives!
Details
       

 07-09-2006
3.0
Engine Baffline
Details
     

 07-08-2006
2.0
Right Door Hinges
Details

 07-07-2006
5.0
Right side door
Details
     

 07-06-2006
2.0
Left Door Hinges
Details
       

 07-04-2006
4.0
Tech Counselor Visit & Doors
Details

 07-03-2006
6.0
Right Side Door
Details
       

 07-02-2006
4.0
Canopy Fiberglass
Details
     

 07-01-2006
4.0
Canopy Rear Skin
Details

 06-30-2006
4.0
Canopy Epoxy
Details

 06-24-2006
10.0
Final Installation of Canopy
Details
       

 06-21-2006
6.0
Glare Shield Painting
Details
       

 06-12-2006
3.0
Rudder Cable Exit Fairings
Details
       

 06-08-2006
2.0
Canopy Fitting
Details
       

 06-06-2006
3.0
Canopy Fitting
Details

 06-05-2006
2.0
Canopy Fitting
Details

 06-04-2006
6.0
Canopy Fitting
Details

 06-03-2006
5.0
Oil Cooler & Oil Hoses
Details

 05-29-2006
5.0
Cowl Baffling
Details
       

 05-28-2006
5.0
Brake Lines
Details
       

 05-27-2006
6.0
AFP Fuel Servo & Exhaust
Details
       

 05-26-2006
4.0
AFP Fuel Pump Installation
Details

 05-25-2006
3.0
AFP Purge Line Plumbing
Details
       

 05-22-2006
4.0
Engine
Details
       

 05-21-2006
5.0
Engine Mount & Nose Gear
Details
       

 05-18-2006
3.0
Flap Control System
Details
       

 05-15-2006
4.0
Forward Fuselage
Details
       

 05-14-2006
7.0
Canopy Fitting
Details
       

 05-13-2006
6.0
Canopy Fitting
Details
       

 05-06-2006
6.0
Control System
Details
       

 04-30-2006
4.0
Forward Fuselage
Details
       

 04-29-2006
2.0
Moved Engine to Garage
Details
       

 04-28-2006
3.0
Assembled Engine Hoist
Details

 04-26-2006
0.0
My engine has arrived!
Details
       

 04-26-2006
0.0
My engine has arrived!
Details
       

 04-26-2006
0.0
My engine has arrived!
Details
       

 04-23-2006
7.0
Final painting of interior panels
Details

 04-22-2006
6.0
Priming interior panels
Details
     

 04-21-2006
4.0
Panel Work
Details
       

 04-20-2006
2.0
Brake & Rudder Pedals
Details
     

 04-19-2006
3.0
Flap Control Rod
Details
       

 04-17-2006
4.0
Rudder Pedal Assembly
Details
       

 04-16-2006
9.0
Fuselage Painting & Oil Cooler
Details
       

 04-15-2006
8.0
Fuselage interior Painting
Details
       

 04-14-2006
4.0
Cowl Hinge
Details
       

 04-13-2006
3.0
Cowl Attach Shims and Hinges
Details
     

 04-12-2006
3.0
Control System
Details
     

 04-09-2006
3.0
Control System
Details
       

 04-08-2006
8.0
Control System
Details
       

 04-07-2006
6.0
Paint Booth Construction
Details
       

 04-06-2006
4.0
Wheels + Tires + Brakes + Gear
Details
       

 01-02-2006
5.0
Right fuel lines & NACA vents
Details
       

 01-01-2006
5.0
Fuel Selector & Fuel Lines
Details
       

 12-27-2005
4.0
Routed rudder cables
Details
       

 12-26-2005
2.0
Rudder/Brake pedals
Details
       

 12-20-2005
5.0
Brake/Rudder Pedal Assembly
Details
       

 12-18-2005
4.0
Metal Prep and Priming
Details
       

 12-17-2005
4.0
Rudder Pedal Prep
Details

 12-10-2005
1.0
Baggage Door Close-out
Details
       

 12-07-2005
3.0
Rear Seat Assembly

 12-06-2005
2.0
Baggage door
Details
       

 12-04-2005
7.0
Priming
Details
       

 11-19-2005
8.0
Rear Seats
Details
       

 11-19-2005
2.0
Baggage Door Hinge
Details
     

 11-16-2005
1.0
Tunnel Covers
Details
     

 11-12-2005
4.0
Brake Lines
Details
     

 11-08-2005
4.0
Baggage Door Assembly
Details
     

 11-06-2005
4.0
Priming baggage door and access panels
Details

 11-05-2005
4.0
Paint Prep and brake lines
Details
     

 11-03-2005
2.5
Right Rear Seat Rivets
Details
       

 11-01-2005
2.0
Baggage Aread
Details
     

 10-31-2005
2.0
Gear Mount & fuselage
Details
       

 10-29-2005
6.0
Access Panels & Landing Gear mount
Details
       

 10-27-2005
3.0
Baggage Area
Details
       

 10-26-2005
2.0
Baggage Area
Details
       

 10-25-2005
3.0
Baggage door seal & right baggage panel
Details
       

 10-23-2005
8.0
Baggage area floors riveted and primed
Details
       

 10-21-2005
7.0
Conduit & Floors
Details
       

 10-17-2005
4.0
Priming fuselage and rear baggage area
Details
       

 10-14-2005
2.0
EAA TECH COUSELOR VISIT!
Details
     

 10-09-2005
4.0
Floorpans & Seat Brackets
Details
       

 10-08-2005
5.0
Tailcone Attach
Details
       

 10-08-2005
2.0
Priming
Details
     

 10-01-2005
6.0
Baggage Section
Details
       

 09-28-2005
5.0
Front floorpans and soundproofing
Details
       

 09-22-2005
2.0
Machine CS the skins? What the...
Details
       

 09-21-2005
4.0
Tailcone Attachment
Details
       

 09-20-2005
3.0
Tailcone Attach
       

 09-18-2005
7.0
Fuselage inspection and nut plates
Details
       

 09-17-2005
10.0
Removing floorpans and gear attach
Details
       

 09-11-2005
6.0
Parts inventory
       

 09-09-2005
2.0
QB Wings, Fuselage, and Finish kit arrive!
Details
       

 09-05-2005
6.0
Trim Actuator and HS attachment
       

 09-04-2005
8.0
Elevator Trim Actuator
       

 08-07-2005
3.0
Right Elevator Tip Fairing
Details
       

 07-24-2005
2.5
Wing Stand Construction
Details
     

 07-05-2005
4.0
Elevator Attach to Tailcone
       

 07-02-2005
6.0
Elevator Fitting
Details
       

 06-21-2005
12.0
Tailcone Riveting
Details
       

 06-07-2005
2.0
Tailcone Riveting
Details
     

 05-28-2005
6.0
Battery/Bellcrank Assembly & Riveting
Details
       

 05-27-2005
8.0
Tailcone Assembly
Details
       

 05-26-2005
9.0
Priming & Tailcone Assembly
Details
       

 05-24-2005
3.0
Priming
Details
       

 05-22-2005
3.0
Tailcone Assembly
Details
       

 05-22-2005
3.0
Priming
Details
       

 05-22-2005
0.5
Priming
Details
       

 05-16-2005
5.0
Priming booth setup
Details
       

 05-06-2005
2.0
Tailcone Assembly
Details

 05-01-2005
4.0
Tailcone Assembly
Details
     

 04-30-2005
4.0
Tailcone Assembly
Details
     

 04-24-2005
2.0
Tailcone Assembly
Details

 04-23-2005
8.0
Tailcone Assembly
Details

 04-21-2005
1.0
Tailcone Assembly
Details

 04-20-2005
2.0
Tailcone Assembly
Details

 04-18-2005
2.0
Tailcone Assembly
Details

 04-10-2005
2.0
Tailcone Assembly
Details
       

 04-09-2005
3.0
Tailcone Assembly
Details
       

 04-09-2005
1.0
Tailcone Assembly
Details
       

 04-09-2005
2.0
Tailcone Assembly
Details
       

 04-07-2005
1.0
Tailcone Assembly
Details

 04-06-2005
1.0
Tailcone Assembly
Details
     

 04-03-2005
3.0
Tailcone assembly
Details
       

 03-30-2005
1.0
Tailcone assembly
Details
     

 03-29-2005
1.0
Tailcone Assembly
Details

 03-26-2005
5.0
Tailcone assembly
Details
       

 03-19-2005
3.0
Tailcone assembly
Details
       

 03-18-2005
3.0
Tailcone assembly
Details
       

 03-13-2005
2.5
Fuselage Stiffeners
Details
       

 03-12-2005
4.0
Workshop Organizing
Details
       

 03-12-2005
4.0
Tailcone assembly
Details
       

 03-11-2005
3.0
Tailcone construction
Details
     

 03-08-2005
1.0
Tools arrived from Cleveland!
Details

 01-09-2005
9.0
HS, Elevator, Trim Tab Riveting
Details
       

 01-08-2005
8.0
HS Riveting
Details
       

 01-08-2005
8.0
HS Riveting
Details
       

 01-07-2005
14.0
VS and Rudder Assembly
Details
       

 01-06-2005
13.0
VS Riveting
Details
       

 01-05-2005
4.0
HS Assembly
Details
       

 01-05-2005
14.0
Elevator Assembly
       

 01-04-2005
4.0
HS Assemby
Details
       

 01-04-2005
4.0
HS Assembly
Details
       

 01-04-2005
12.0
HS Assembly
Details
       

 01-03-2005
4.0
VS AND RUDDER ASSEMBLY
Details
       

 01-03-2005
8.0
VS and Rudder Assembly
Details
       

 01-02-2005
5.0
DEPARTING TO ATC IN GRIFFIN
Details
       

 01-02-2005
0.0
ATC FACILITY
Details
       

 01-02-2005
0.0
ARRIVING AT ATC IN GRIFFIN
Details
       

 12-12-2004
1.0
INVENTORY

 12-07-2004
1.5
INVENTORY

 12-05-2004
1.0
INVENTORY

 12-04-2004
3.0
INVENTORY
Details
       

 12-03-2004
2.0
EMPENNAGE ARRIVAL
Details
       

 11-18-2004
0.5
RV PRACTICE KIT ARRIVAL
Details
     