Brians RV-10 Construction
RV-10
All
248 Logs Found
Date
Hours
Work Log Summary
Details
11-30-2009
2.2
Instrument Training
Details
08-01-2008
0.0
Painted!
Details
06-30-2008
0.0
Trip to 52F (Glo-Custom) for painting!
Details
06-23-2008
0.0
Flew to Piqua, OH to have Prop serviced
Details
03-22-2008
1.0
N104BS Flies!
Details
02-25-2008
6.0
NOSE WHEEL FAIRING
Details
02-23-2008
8.0
PLACARDS & COWL DETAILS
Details
02-21-2008
3.0
PITOT STATIC TRANSPONDER CHECK
Details
02-17-2008
5.0
FINAL COWL DETAILS
Details
02-15-2008
8.0
MISC FINISHING
Details
02-10-2008
3.0
DOOR LATCH WARNING SYSTEM
02-09-2008
3.0
RIGHT WINGTIP LENS
02-05-2008
8.0
PILOT CONTROL GRIP & AILERON TRIM
02-04-2008
6.0
INSTRUMENT PANEL LABELING
02-03-2008
6.0
INSTALLED NOSE WHEEL FAIRING
01-12-2008
8.0
MFD & MISC WIRING, SOFTWARE UPGRADED
Details
01-10-2008
8.0
AUTOPILOT AND ANALOG INSTRUMENTS
Details
01-09-2008
8.0
TRANSPONDER CONNECTIONS
Details
01-07-2008
14.0
AVIONICS WIRING
Details
01-05-2008
6.0
MISC ELECTRICAL
Details
12-29-2007
4.0
PITOT & STATIC LINES
Details
12-29-2007
2.0
FIRST ENGINE START!
Details
12-15-2007
8.0
RIGHT WING ROOT FAIRING COMPLETED
Details
12-08-2007
5.0
LEFT WING ROOT FAIRING COMPLETED
Details
11-24-2007
8.0
INSTALLED RADIOS
Details
11-17-2007
8.0
INSTALLED AND WIRED SWITCHES
Details
11-01-2007
8.0
WIRING
Details
10-29-2007
4.0
WING ROOT CONNECTIONS
Details
10-27-2007
9.0
WING FINAL ATTACH
Details
10-26-2007
8.0
WING ATTACH PREP
Details
10-12-2007
6.0
UV SMOOTHPRIME APPLICATION
Details
10-12-2007
6.0
LEFT WINGTIP LIGHTS & WIRING
Details
10-10-2007
30.0
APPLIED THE LAST OF THE FILLER!
Details
10-06-2007
5.0
RIGHT FLAP ATTACH
Details
10-05-2007
6.0
LEFT FLAP ATTACH
Details
09-24-2007
3.0
PREPARING THE INSTRUMENT PANEL
09-15-2007
30.0
MOVING TO THE AIRPORT
Details
09-06-2007
10.0
TRANSITION TRAINING WITH MIKE SEGAR
Details
07-19-2007
10.0
INSTRUMENT PANEL PLANNING
Details
07-14-2007
2.0
Windscreen Fairing
Details
07-14-2007
6.0
ASSEMBLED RADIO STACK
Details
07-07-2007
4.0
Pinpoint GADAHRS Bracket
Details
07-04-2007
7.0
Windscreen Base Fairing
Details
07-03-2007
3.0
Windscreen Microbaloon Fillet
Details
05-06-2007
6.0
Ailerons, Flaps, Pitot
Details
05-04-2007
16.0
Wing Skins
Details
05-03-2007
8.0
Right Wing Bottom Skin
Details
04-26-2007
8.0
Fitting Doors & Windows
Details
04-22-2007
4.0
Cowling
Details
04-21-2007
4.0
Cowling
Details
04-20-2007
4.0
Cowling
Details
03-24-2007
5.0
QB Wing Assembly
03-22-2007
6.0
QB Wing Assembly
03-21-2007
6.0
QB Wing Assembly
03-20-2007
6.0
QB Wing Assembly
03-19-2007
6.0
QB Wing Assembly
02-26-2007
2.0
TT Pitch Servo
Details
02-25-2007
6.0
Wing Conduit and Roll Servo
Details
02-24-2007
4.0
Autopilot Pitch Servo
Details
01-19-2007
4.0
FlightLine Interiors Front Seats
Details
01-14-2007
5.0
Empennage Fairing
01-13-2007
6.0
Rudder Attach
Details
01-13-2007
4.0
Power Runs
Details
01-13-2007
4.0
ELT Installation
Details
01-13-2007
3.0
Battery & Stobe Power Supply
Details
01-07-2007
4.0
Wiring/Setting Trim System
12-21-2006
20.0
Empennage Attach
Details
12-03-2006
4.0
HS to Fuselage Fairing
Details
12-02-2006
3.0
Fairing Work
Details
12-01-2006
4.0
HS Tips
Details
11-11-2006
5.0
Attaching Fairings
Details
11-11-2006
5.0
Attaching Fairings
Details
11-02-2006
30.0
Cowl Baffling
Details
10-05-2006
4.0
Cowl Side Hinge - Left
Details
09-30-2006
8.0
Cowling Work
Details
09-23-2006
6.0
Pilot's Door
Details
09-22-2006
4.0
Left Rear Window Installed
Details
09-16-2006
1.2
RV-10 Transition Training w/ Mike!
Details
09-16-2006
8.0
Passenger Door Assembly
Details
09-13-2006
2.3
RV-10 Transition Training w/ Mike
Details
09-10-2006
6.0
Passenger Side Door
Details
09-09-2006
7.0
Pilot Side Door
Details
09-07-2006
1.0
EIS Returned from GRT
Details
09-03-2006
10.0
Upper Cowl
Details
08-26-2006
6.0
Spinner Assembly
Details
08-25-2006
5.0
Spinner Assembly
Details
08-22-2006
3.0
Engine Baffling
Details
08-20-2006
4.0
Throttle & Mixture cables
Details
08-19-2006
3.0
GRT EIS EGT & CHT PROBES
Details
07-25-2006
4.0
Tailcone Fwd Top Skin
Details
07-16-2006
2.0
SERVICE BULLETIN SB 06-2-3
Details
07-16-2006
5.0
HS & Elevator Fiberglass Tips
Details
07-16-2006
3.0
FLOSCAN and CABIN HEAT
Details
07-12-2006
2.0
Bogert Bar and Nose Gear Fairing Spacers
Details
07-10-2006
2.0
Hartzell Prop Arrives!
Details
07-09-2006
3.0
Engine Baffline
Details
07-08-2006
2.0
Right Door Hinges
Details
07-07-2006
5.0
Right side door
Details
07-06-2006
2.0
Left Door Hinges
Details
07-04-2006
4.0
Tech Counselor Visit & Doors
Details
07-03-2006
6.0
Right Side Door
Details
07-02-2006
4.0
Canopy Fiberglass
Details
07-01-2006
4.0
Canopy Rear Skin
Details
06-30-2006
4.0
Canopy Epoxy
Details
06-24-2006
10.0
Final Installation of Canopy
Details
06-21-2006
6.0
Glare Shield Painting
Details
06-12-2006
3.0
Rudder Cable Exit Fairings
Details
06-08-2006
2.0
Canopy Fitting
Details
06-06-2006
3.0
Canopy Fitting
Details
06-05-2006
2.0
Canopy Fitting
Details
06-04-2006
6.0
Canopy Fitting
Details
06-03-2006
5.0
Oil Cooler & Oil Hoses
Details
05-29-2006
5.0
Cowl Baffling
Details
05-28-2006
5.0
Brake Lines
Details
05-27-2006
6.0
AFP Fuel Servo & Exhaust
Details
05-26-2006
4.0
AFP Fuel Pump Installation
Details
05-25-2006
3.0
AFP Purge Line Plumbing
Details
05-22-2006
4.0
Engine
Details
05-21-2006
5.0
Engine Mount & Nose Gear
Details
05-18-2006
3.0
Flap Control System
Details
05-15-2006
4.0
Forward Fuselage
Details
05-14-2006
7.0
Canopy Fitting
Details
05-13-2006
6.0
Canopy Fitting
Details
05-06-2006
6.0
Control System
Details
04-30-2006
4.0
Forward Fuselage
Details
04-29-2006
2.0
Moved Engine to Garage
Details
04-28-2006
3.0
Assembled Engine Hoist
Details
04-26-2006
0.0
My engine has arrived!
Details
04-26-2006
0.0
My engine has arrived!
Details
04-26-2006
0.0
My engine has arrived!
Details
04-23-2006
7.0
Final painting of interior panels
Details
04-22-2006
6.0
Priming interior panels
Details
04-21-2006
4.0
Panel Work
Details
04-20-2006
2.0
Brake & Rudder Pedals
Details
04-19-2006
3.0
Flap Control Rod
Details
04-17-2006
4.0
Rudder Pedal Assembly
Details
04-16-2006
9.0
Fuselage Painting & Oil Cooler
Details
04-15-2006
8.0
Fuselage interior Painting
Details
04-14-2006
4.0
Cowl Hinge
Details
04-13-2006
3.0
Cowl Attach Shims and Hinges
Details
04-12-2006
3.0
Control System
Details
04-09-2006
3.0
Control System
Details
04-08-2006
8.0
Control System
Details
04-07-2006
6.0
Paint Booth Construction
Details
04-06-2006
4.0
Wheels + Tires + Brakes + Gear
Details
01-02-2006
5.0
Right fuel lines & NACA vents
Details
01-01-2006
5.0
Fuel Selector & Fuel Lines
Details
12-27-2005
4.0
Routed rudder cables
Details
12-26-2005
2.0
Rudder/Brake pedals
Details
12-20-2005
5.0
Brake/Rudder Pedal Assembly
Details
12-18-2005
4.0
Metal Prep and Priming
Details
12-17-2005
4.0
Rudder Pedal Prep
Details
12-10-2005
1.0
Baggage Door Close-out
Details
12-07-2005
3.0
Rear Seat Assembly
12-06-2005
2.0
Baggage door
Details
12-04-2005
7.0
Priming
Details
11-19-2005
8.0
Rear Seats
Details
11-19-2005
2.0
Baggage Door Hinge
Details
11-16-2005
1.0
Tunnel Covers
Details
11-12-2005
4.0
Brake Lines
Details
11-08-2005
4.0
Baggage Door Assembly
Details
11-06-2005
4.0
Priming baggage door and access panels
Details
11-05-2005
4.0
Paint Prep and brake lines
Details
11-03-2005
2.5
Right Rear Seat Rivets
Details
11-01-2005
2.0
Baggage Aread
Details
10-31-2005
2.0
Gear Mount & fuselage
Details
10-29-2005
6.0
Access Panels & Landing Gear mount
Details
10-27-2005
3.0
Baggage Area
Details
10-26-2005
2.0
Baggage Area
Details
10-25-2005
3.0
Baggage door seal & right baggage panel
Details
10-23-2005
8.0
Baggage area floors riveted and primed
Details
10-21-2005
7.0
Conduit & Floors
Details
10-17-2005
4.0
Priming fuselage and rear baggage area
Details
10-14-2005
2.0
EAA TECH COUSELOR VISIT!
Details
10-09-2005
4.0
Floorpans & Seat Brackets
Details
10-08-2005
5.0
Tailcone Attach
Details
10-08-2005
2.0
Priming
Details
10-01-2005
6.0
Baggage Section
Details
09-28-2005
5.0
Front floorpans and soundproofing
Details
09-22-2005
2.0
Machine CS the skins? What the...
Details
09-21-2005
4.0
Tailcone Attachment
Details
09-20-2005
3.0
Tailcone Attach
09-18-2005
7.0
Fuselage inspection and nut plates
Details
09-17-2005
10.0
Removing floorpans and gear attach
Details
09-11-2005
6.0
Parts inventory
09-09-2005
2.0
QB Wings, Fuselage, and Finish kit arrive!
Details
09-05-2005
6.0
Trim Actuator and HS attachment
09-04-2005
8.0
Elevator Trim Actuator
08-07-2005
3.0
Right Elevator Tip Fairing
Details
07-24-2005
2.5
Wing Stand Construction
Details
07-05-2005
4.0
Elevator Attach to Tailcone
07-02-2005
6.0
Elevator Fitting
Details
06-21-2005
12.0
Tailcone Riveting
Details
06-07-2005
2.0
Tailcone Riveting
Details
05-28-2005
6.0
Battery/Bellcrank Assembly & Riveting
Details
05-27-2005
8.0
Tailcone Assembly
Details
05-26-2005
9.0
Priming & Tailcone Assembly
Details
05-24-2005
3.0
Priming
Details
05-22-2005
3.0
Tailcone Assembly
Details
05-22-2005
3.0
Priming
Details
05-22-2005
0.5
Priming
Details
05-16-2005
5.0
Priming booth setup
Details
05-06-2005
2.0
Tailcone Assembly
Details
05-01-2005
4.0
Tailcone Assembly
Details
04-30-2005
4.0
Tailcone Assembly
Details
04-24-2005
2.0
Tailcone Assembly
Details
04-23-2005
8.0
Tailcone Assembly
Details
04-21-2005
1.0
Tailcone Assembly
Details
04-20-2005
2.0
Tailcone Assembly
Details
04-18-2005
2.0
Tailcone Assembly
Details
04-10-2005
2.0
Tailcone Assembly
Details
04-09-2005
3.0
Tailcone Assembly
Details
04-09-2005
1.0
Tailcone Assembly
Details
04-09-2005
2.0
Tailcone Assembly
Details
04-07-2005
1.0
Tailcone Assembly
Details
04-06-2005
1.0
Tailcone Assembly
Details
04-03-2005
3.0
Tailcone assembly
Details
03-30-2005
1.0
Tailcone assembly
Details
03-29-2005
1.0
Tailcone Assembly
Details
03-26-2005
5.0
Tailcone assembly
Details
03-19-2005
3.0
Tailcone assembly
Details
03-18-2005
3.0
Tailcone assembly
Details
03-13-2005
2.5
Fuselage Stiffeners
Details
03-12-2005
4.0
Workshop Organizing
Details
03-12-2005
4.0
Tailcone assembly
Details
03-11-2005
3.0
Tailcone construction
Details
03-08-2005
1.0
Tools arrived from Cleveland!
Details
01-09-2005
9.0
HS, Elevator, Trim Tab Riveting
Details
01-08-2005
8.0
HS Riveting
Details
01-08-2005
8.0
HS Riveting
Details
01-07-2005
14.0
VS and Rudder Assembly
Details
01-06-2005
13.0
VS Riveting
Details
01-05-2005
4.0
HS Assembly
Details
01-05-2005
14.0
Elevator Assembly
01-04-2005
4.0
HS Assemby
Details
01-04-2005
4.0
HS Assembly
Details
01-04-2005
12.0
HS Assembly
Details
01-03-2005
4.0
VS AND RUDDER ASSEMBLY
Details
01-03-2005
8.0
VS and Rudder Assembly
Details
01-02-2005
5.0
DEPARTING TO ATC IN GRIFFIN
Details
01-02-2005
0.0
ATC FACILITY
Details
01-02-2005
0.0
ARRIVING AT ATC IN GRIFFIN
Details
12-12-2004
1.0
INVENTORY
12-07-2004
1.5
INVENTORY
12-05-2004
1.0
INVENTORY
12-04-2004
3.0
INVENTORY
Details
12-03-2004
2.0
EMPENNAGE ARRIVAL
Details
11-18-2004
0.5
RV PRACTICE KIT ARRIVAL
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
All
A/C Hardware & Supplies
Avionics
Empennage
Engine
Firewall Forward
Flight
Fuselage
Hardware
Insturment Panel
Interior
Miscellaneous
None
Paperwork
Prop
Systems
Tools
Training
Wings