KitLog pro

Powered By Kitlog Pro v2.0

Brians RV-10 Construction
' style=
Date:  9-17-2005
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Removing floorpans and gear attach

At this point I'm still struggling to find a good starting point. I decided that inspecting the kit was the best thing to do, and that required pulling the floor pans. I spend the whole day drilling out pop rivest and pulling all of the parts out of the fuselage. The front pans required the gear leg attachments to be removed to get them out (and that is time consuming!)
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.