Powered By Kitlog Pro v2.0
Ralph Finch RV-9A Build
RV-9A
Fuselage
5-6-2012
< Previous Log Entry
Next Log Entry >
Date:
5-6-2012
Number of Hours:
4.00
Manual Reference:
Brief Description:
Mostly riveted the area where the canopy frame bol
Mostly riveted the area where the cabin canopy frame bolts onto the fuselage (e.g. DWG 25 Detail A). But not yet the top 3 or 4 rivets which are very hard to reach.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
785
2214
Canopy
62
162
Controls
22
40
Cowl
85
172
Electrical
54
134
Empennage
30
111
Engine
88
193
Firewall
20
45
Fluid Plumbing
44
138
Fuselage
175
560
Garage Setup
10
87
LdgGear/Wheels
11
18
Miscellaneous
25
90
Plumbing
44
138
Tools
1
2
Wings
114
324
Copyright © 2001-2024 Matronics. All Rights Reserved.