Got some long and offset rivet sets for the difficult top rivets in Section J-J DWG 25. Attempted to rivet the inner-top rivets with shop head aft, but even cutting away some of bottom of canopy deck channel, it didn't work. Then figured out reversing the rivets was a lot easier. But the two rivets I put in were bunged and I left it for the day.