Brief Description: Finished items to re-install baggage floors and F-
Riveted last rivets in Detail B DWG 26; checked and tighten all bolts and screws; attached extra brackets and then baggage lights to Channel F-732A; drilled and screwed addtl Adel clamps to hold wire for baggage lights positive wire.