We're on the way to completing 6-4. I finally (after 45 minutes of looking) found VS-1015 hidden on the shelf. After that, I'm going to find a new method or storing parts.
VS-1015 is the front spar doubler. I used clecos to hold it in place, final drilled #30s, disassembled, deburred the holes, and deburred the edges of VS-1015.
We're getting down to the final construction steps of the Vertical Stabilizer. Tomorrow, I'm planning on building a simple paint booth with Tom Ledoux and my Dad. If we can get it completed, there is a very good chance that I'll be able to finish construction on the VS and maybe even get started alodining the parts.
I apologize for not having pictures the past few days, but there really hasn't been anything exciting so I didn't take them. Tomorrow, we'll definately have some photos.