KitLog pro

Powered By Kitlog Pro v2.0

RV-10 Project - N786PS
' style=
Date:  8-23-2007
Number of Hours:  0.50
Manual Reference:  6-4
Brief Description:  Starting page 6-4

We're on the way to completing 6-4. I finally (after 45 minutes of looking) found VS-1015 hidden on the shelf. After that, I'm going to find a new method or storing parts.

VS-1015 is the front spar doubler. I used clecos to hold it in place, final drilled #30s, disassembled, deburred the holes, and deburred the edges of VS-1015.

We're getting down to the final construction steps of the Vertical Stabilizer. Tomorrow, I'm planning on building a simple paint booth with Tom Ledoux and my Dad. If we can get it completed, there is a very good chance that I'll be able to finish construction on the VS and maybe even get started alodining the parts.

I apologize for not having pictures the past few days, but there really hasn't been anything exciting so I didn't take them. Tomorrow, we'll definately have some photos.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.