KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  1-8-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fuel System install #3 (or #2 redo)

Well in trying to get the right tank fuel line to properly position along the front of the spar I found it need too much tweaking so I cut off the bends that I had put in it at the fuel selector and started over with a new flared end and new bends. The previous one was too close to the rudder cable for my taste. The new one is much improved and I am back to where I was. Next step is to bend the line where it exits the fuselage.
' style=

Here you can see the line fitted to the selector valve and loosely in position along the spar

Here you can see the line fitted to the selector valve and loosely in position along the spar

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.