-Did the left and right wing fuel tank vent lines. Drilled the hole in the tank attach bracket for the inverted fuel line to go through. -Wired the strobe light wing root molex connectors (R/L) -Started work on flap fitting - trimming inboard top skin to mate up with the fuselage.