KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-29-2010
Number of Hours:  8.30
Manual Reference:  
Brief Description:  Cowling #4

Big session today. I managed to trim the bottom cowling totally
-Trimmed the aft vertical sides of the cowl
-Cut hinges to go on those vertical sides and drilled and cleco'd to the fuselage
-Once I had the vertical sides trimmed and fitted to my satisfaction I layed out the rivet locations and match-drilled.
-Layed out using a laser level the horizontal joint between the upper and lower cowl
-Cut the lower cowling and did many many trimming/sanding 'adjustments' to get all the seams and the cowl ailignment to my satisfaction.
I still need to put in the horizontal joint hinge and rivet the vertical hinges to the firewall and then rivet all the hinges (and bond) to the cowling itself. Lot more work to do, but some really hard steps are now behind me. Also, this session put me past 1600 hrs total time on the build (not counting research). 3 yrs and 10 months since I started.
' style=

Trimming the aft vertical edge of the bottom cowl

Trimming the aft vertical edge of the bottom cowl

' style=

Laser level helped me mark where to trim the lower cowl that is overlapping the upper cowl presently

Laser level helped me mark where to trim the lower cowl that is overlapping the upper cowl presently

' style=

Cowl up to this point. Getting closer to done

Cowl up to this point. Getting closer to done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.