KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-11-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  More stabilizer fairings and wheel pants #2

Got up early before I drove Mitchel to BMX camp (Woodward, PA). I sanded the primer/filler on the stabilizer tips and them put some Superfill in the low spots.

Moved onto the wheel pants. I layed out a horizontal line that bisected (approx) each wheel pant.
-Started trimming the left aft pant to go around the gear leg per the plans
' style=

Tips sanded and low spots touched up with Superfill

Tips sanded and low spots touched up with Superfill

' style=

Line bisecting the horizontal plan on the wheel pants

Line bisecting the horizontal plan on the wheel pants

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.