KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  5-19-2010
Number of Hours:  1.10
Manual Reference:  
Brief Description:  Landing gear intersection fairings #5

-Began the sanding process on the upper intersection fairings
-Separated the fairings from the fuselage and slide the left one down the gear so I could gain access to the back to make a vertical cut to allow removal. In doing so the trailing edge that I attempted to reattach separated so I need to fix that. That is the nice thing about glass not problem is beyond repair, at least on com
' style=

Some of the initial sanding done

Some of the initial sanding done

' style=

Here I have separated the fairing from the fuse and slid it down the gear leg.

Here I have separated the fairing from the fuse and slid it down the gear leg.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.