KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-21-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Smoke oil tank install #4

Fitted the tank on top of the supports. Had to trim one of the straps so I could slide the tank to the right to give me more room for the fittings and the sump so they don't interfer with the strobe pack.
Drilled the mounting holes for the straps to bolt to the braces.
Installed and torqued the braces to the airframe
Set the tank in place in preparation for bolting it in.
' style=

Braces bolted into place.

Braces bolted into place.

' style=

Here is the tank in place. The fittings on the right side of picture (left side of airplane)

Here is the tank in place. The fittings on the right side of picture (left side of airplane)

' style=

Another angle

Another angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.