KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-5-2009
Number of Hours:  1.20
Manual Reference:  8-68
Brief Description:  Fwd Upper Fuselage #3

This was fun!
-Riveted the 12 nutplates onto the left and right subpanels of the instrument panel.
-Riveted the attach flange to the subpanels. Using the instrument panel to align them per the plans (one screw hole lower so you can access the rivets)
-Cleco'd it into the airplane - gladly. Note the plans say to leave the panel 1 screw hole lower between the subpanels for now.
' style=

Nutplates are in - I love putting in nutplates - really!

Nutplates are in - I love putting in nutplates - really!

' style=

Wow I am loosing my hair - her I am squeezing the attafch flange to subpanel rivets.

Wow I am loosing my hair - her I am squeezing the attafch flange to subpanel rivets.

' style=

Relieved the slot slightly in both L/R subpanels to accept the top longeron and it fit perfect!

Relieved the slot slightly in both L/R subpanels to accept the top longeron and it fit perfect!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.