Head scratchin' took up most of the session with the holes that need to go into the bulkheads for the pushrod. I did do a few things: -Cleco'd the rear thottle into position -Layed the pushrod up there roughly in position to get a sense of where it runs -I removed the front quadrant, disassembled it and drilled out the pushrod attach hole per the plans
Cleco'd the rear thottle into position
Layed the pushrod up there roughly in position to get a sense of where it runs.
I removed the front quadrant, disassembled it and drilled out the pushrod attach hole per the plans