Started on the rear throttle quadrant. Spent most of my time scratching my head, but finally got going. First order of business was to drill out two nutplates on the F806 bulkhead-Vans assumes you aren't putting in the optional rear throttle - crap. Next I marked off the bracket and clamped and drilled in position. Next I deburred and drilled for nutplates (7) and then prepped and primed.
Had to remove the two nuplates on the F806.
Clamped and drilled it into place.
Primed the bracket along with the mid cabin covers