KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  2-25-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Prepping for interior primer

Well I did a good job of priming everything prior to assembly expect the fwd floor and the gear towers. The insides are primed but I left the exterior anticpating expoxy primer at later date, but I have decided that the 7220 is durable and the right texture and color for me so now I need to get it done.
I removed the control sticks and column
Removed the gear tower access plates
Scuffed and cleaned the floor

Next I will need to tape off the spar (gold anodized), firewall, and weldments.
' style=

This is the area that needs primed, floor and gear towers.

This is the area that needs primed, floor and gear towers.

' style=

I also match drilled and hole deburred the shoulder harness doublers.

I also match drilled and hole deburred the shoulder harness doublers.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.