Brief Description: Control System Installation #12
More control system fun! I'm really ready to move onto another part of the build - my A.D.D. is really kicking in. Today was elevator bellcrank day. I installed the elevator bellcrank to the baggage rib area and the spacers called out in the plans and I must have spent :30+ minutes putting in one bolt due to all the crap that had to squeeze in to the sandwich which was, bellcrank, 2 washer on each side and the bolt and nut-not fun! -Then I hooked up the F839 to the bellcrank before installation per the plans and then the F840 (long pushrod).
Looks simple enough. I bolt a couple of washer - yeah right!