KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  6-14-2008
Number of Hours:  1.00
Manual Reference:  8-15
Brief Description:  Longeron Bending #2

Finished up bending the R lower longeron and the auxiliary longerons. I will forego the uppers until they are ready to install.
' style=

Opening up the aft end of the right longeron.

Opening up the aft end of the right longeron.

' style=

6.75 degrees per the plans - pretty close since this level only shows tenths.

6.75 degrees per the plans - pretty close since this level only shows tenths.

' style=

The 2 lower longerons are done.

The 2 lower longerons are done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.