KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-13-2008
Number of Hours:  1.20
Manual Reference:  8-5
Brief Description:  Gear Tower - Assembly #2

Feeling really motivated to work on the plane since I returned from vacation.

-Cleco'd the forward and aft angles onto the forward and aft bulkheads for each gear tower (including nutplates).

-Riveted the angles and nutplates to their respective bulkheads (fore/aft) on both left and right towers.



-
' style=

Riveting the primered angles onto the bulkhead (2 per tower - 4 total).

Riveting the primered angles onto the bulkhead (2 per tower - 4 total).

' style=

The corner angle riveted on - the other holes are for 3/16

The corner angle riveted on - the other holes are for 3/16" bolts.

' style=

This step done.

This step done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.