KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  9-16-2010
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Windshield drilling

-Did the final trim on the canopy latch hook - works great
-Final locating of the windshield on the fuselage and canopy bow
-Measured ou the screw locations that attach the w/s to the canopy bow.
-Layed out the holes and drilled to #40

Good progress.

Pic 3 shows my gap I mentioned in a previous entry. It's not an issue on the exterior because this area is covered by the fiberglass fairing, but the inside will be tricky and it is very visable from the cockpit.
' style=

Drilling went fine, but it makes me nervous messing with the plexi

Drilling went fine, but it makes me nervous messing with the plexi

' style=

Carefully drilling the screw holes

Carefully drilling the screw holes

' style=

Gap at the w/s base

Gap at the w/s base

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.