Brent s RV-8 Project N784DE
' style=
Date:  1-5-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Aileron actuation #1

Not a real productive session this morning. I need to do a lot of random stuff to get to my goal of getting the aileron actuation system installed. I had to remove the fuel tanks to access (I needed to anyway for some rivets that I didn't install in the rib-to-spar flange area) the wing tie down brackets so they could be torqued and then I could work on installing the bellcrank attach brackets. I also spent some time locating all of the hardware, removing labels, etc.
' style=

Fuel tanks removed.

Fuel tanks removed.

' style=

Hardware for the bellcrank located and sorted

Hardware for the bellcrank located and sorted

' style=

Torqued and torque locked the tie down bracket nuts (25in lbs).

Torqued and torque locked the tie down bracket nuts (25in lbs).

' style=