KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  7-7-2007
Number of Hours:  1.80
Manual Reference:  
Brief Description:  Landing light installation #2 (right)

This morning I worked on opening up the landing light hole in the leading edge carefully to the prescribed dimensions. I used the shears to get within about 1/4" from the edge and used the dremmel with a sanding drum (60 grit) to take it out from there. Once I was satisfied, I sanding with emery cloth and 240 and then 600 grit to get it nice and smooth. Next was to drill the hole in the skin where the lense screws go. I used the supplied pre-drilled brace as a template per the plans. Then I moved to install the nutplates onto the ribs to attach the landing light assembly. All went well and hopefully I'll knock this out in a couple more days. Beautiful weather, Mitchel and I went dirtbiking!
' style=

Gotta love cutting metal with over-grown sissors!

Gotta love cutting metal with over-grown sissors!

' style=

Done! With the hole anyway!

Done! With the hole anyway!

' style=

Drilling the lense attach screw holes using the backing plate as a template.

Drilling the lense attach screw holes using the backing plate as a template.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.