KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-28-2007
Number of Hours:  1.70
Manual Reference:  
Brief Description:  Drilling the fuel tanks part #1

Satisfied with the fuel tanks I began by drilling the joint plate to fuel tank screw holes on both wings and the root rib to Z brackets. Then I removed all the cleco's holding the leading edge on - be sure to un-cleco the inboard rib where the joint plate is and removed the leading edge without it as you can remove it later. I then drilled out the outboard rib on the left wing and removed the fuel tank. Tomorrow I will finish drilling the left wing and move over to the right wing.
' style=

Drilling the root rib to Z bracket ont the left wing.

Drilling the root rib to Z bracket ont the left wing.

' style=

Fuel tank removed except for the end ribs and the rear baffle.

Fuel tank removed except for the end ribs and the rear baffle.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.