KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  4-2-2007
Number of Hours:  1.40
Manual Reference:  
Brief Description:  Started laying out the wing walk doubler

Up at 5am this morning before work. I worked on the wing walk doublers. The plans have you cutting the doublers out of two larger pieces and then laying it under the W-702 skin and match drilling. Took me some time just to locate all the pieces and figure out how I wanted to attack the task. Once I got to drilling it went very fast. I drilled out the right wing and I have to do the left one this afternoon.
' style=

Laying out the doubler material and skins that will be used as a template for drilling the holes.

Laying out the doubler material and skins that will be used as a template for drilling the holes.

' style=

Cutting the doublers down to size.

Cutting the doublers down to size.

' style=

Match drilling the holes

Match drilling the holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.