KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  8-9-2009
Number of Hours:  3.00
Manual Reference:  10-4
Brief Description:  Landing Gear Install #4

-Took the axle assemblies apart so I could measure the toe-in and they came out perfect
-Reassembed the axle assemblies (L/R) with torque loc
-Drilled the axle for the cotter key and installed the wheels and brakes
-Assembed the tailwheel and installed

Dick Wetherald (EAA 9 President) and Lenny Mack (IT consultant) came by to work on some chapter stuff and I got them to help me set the airplane on it's gear - too cool! I couldn't get a good picture of it because I'm running out of room in the garage, but I'm very excited to have this done.
' style=

Right axle assembly installed and torqu loc'd and drilling the cotter pin hole in the axle

Right axle assembly installed and torqu loc'd and drilling the cotter pin hole in the axle

' style=

Lenny and Dick after helping me set the airplane down onto the floor.

Lenny and Dick after helping me set the airplane down onto the floor.

' style=

Rolling around freely on it's own legs!!!

Rolling around freely on it's own legs!!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.