KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  11-7-2006
Number of Hours:  1.70
Manual Reference:  6-4
Brief Description:  Vertical Stab Drilling/Deburring

Match drilled Vertical Stabilizer(VS) skin to the sub-structure. Trimmed plastic coating along the rivet line on the skins. Un-cleco'd everything and started deburring the holes in all the ribs and spars. Next will be to finish deburring and then dipple and counter-sink the appropriate holes.
' style=

Match drilling the VS skin to the sub-structure

Match drilling the VS skin to the sub-structure

' style=

Trimming the protective plastic for riveting

Trimming the protective plastic for riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.