Continued to work on sorting out the brake and fuel vent lines that transverse the gear towers. I have the basic shapes worked out and I have the fittings flaired on the right tower along with the plastic sleeve for the brake line installed. I haven't put them in for the final time or trimmed off the vent on the outside bottom of the fuselage. Good progress.
Here's the right brake line with plastic sleeve and ends installed.