Drilled the forward attach bracket and doubler to the nose of both end ribs this morning. I then fabricated a cover for the tooling hole on the end rib of each tank. Nothing gets riveted in at this point, they are installed with ProSeal.
Drilling the attach bracket to the root rib.
Doubler that goes on the nose of each end of each fuel tank.