KitLog pro

Powered By Kitlog Pro v2.0

Brent s RV-8 Project N784DE
' style=
Date:  3-16-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Wiring organization

-Connected all of the outgoing wires from the infinity grip terminals.
-Installed adel clamps as mentioned previously for the two main cross-cockpit wiring runs. Spent the rest of the time organizing the speghetti into something that looks reasonably airworthy. I still don't have the primary EFIS or the the harnesses for the radios, but that shouldn't be a big deal to add on now that the basic DC power distribution system is in place. The stick, intercom, flood/interior lights, and Dynon are all wired up for the most part.
' style=

Infinity grip terminal strips

Infinity grip terminal strips

' style=

The two main cross-cockpit bundles are visible in this shot

The two main cross-cockpit bundles are visible in this shot

' style=

c/b panel

c/b panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.