KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-21-2006
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Drill F705 for Static Line; Route to Sub Panel

Today I decided to take the plunge and drill a 1/4" hole through the F705 bulkhead and upper reinforcement angle for the static line. I'm not sure why the plans do not call out a location for drilling this hole but I checked with Van's and they said the location outlined below would be fine. I had to climb in the baggage area and use an angle drill to make this hole. I started off small and worked my way up to 1/4". I didn't go any bigger than this for a bushing since this bulkhead and angle are thick enough and the static line tough enough that I doubt abrasion will be an issue. Once this hole was drilled I routed the static line along the the longeron and through the canopy decks to the subpanel.
' style=

Static line routed through the F-705 bulkhead

Static line routed through the F-705 bulkhead

' style=

Static line routed along the canopy deck

Static line routed along the canopy deck

' style=

1/4

1/4" hole through the F705 bulkhead

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.