KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  4-12-2006
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Position, Clamp, and Drill Aft Strut Brackets to D

Once the canopy frame was back on the fuselage I measured 9 11/16" back from the forward brackets that were screwed to the frame. The C-728 aft strut brackets and C-729 spacers were then clamped to the canopy deck. Before actually drilling these to the canopy deck, I installed the struts to the front brackets to double check my measurements. The aft brackets and spacers were then drilled to the canopy decks.
' style=

Left C-728 strut bracket and C-729 spacers clamped 9 11/16

Left C-728 strut bracket and C-729 spacers clamped 9 11/16" aft of front brackets

' style=

Left aft strut bracket and spacers drilled to canopy deck

Left aft strut bracket and spacers drilled to canopy deck

' style=

Right aft strut bracket and spacers drilled to canopy deck

Right aft strut bracket and spacers drilled to canopy deck

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.