KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  1-31-2004
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Longerons: Drill F721B Aft Canopy Decks

The final work that I did on the longerons today was clamp and drill the F721B aft canopy decks to the longerons.
' style=

F721B aft canopy deck clamped to longeron and ready to drill

F721B aft canopy deck clamped to longeron and ready to drill

' style=

F721B aft canopy decks drilled and clecoed to longerons

F721B aft canopy decks drilled and clecoed to longerons

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.