|
|
Dan's Web Site
|
Date: 12-24-2006
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: Sand / Clean / Prime Left Elevator
|
|
Today I sanded the left elevator, vacuumed out the pinholes, cleaned the surfaces with Acetone, filled the pinholes with Wonder-Fil, and then primed. Once the primer was dry I removed the masking, cleaned up the aluminum with Acetone and suspended left elevator from the ceiling with the other empennage parts.
|
|
Left elevator sanded, cleaned, pinholes filled, and ready for primer
|
|
Left elevator primed
|
|
Left elevator unmasked, cleaned, and ready to be stored away
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |