KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  5-8-2002
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Match Drilling the Left Side

Match drilling the left side of the horizontal stabilizer went quickly. The challenge was getting the clecoes out of the undersized prepunched holes. My arms and wrists got a little tired. I think I need to lower my workbench a couple of inches.
' style=

Aft look at the HS-404,405 Ribs and Front Spar

Aft look at the HS-404,405 Ribs and Front Spar

' style=

Left side clecoed and drilled

Left side clecoed and drilled

' style=

Left front spar drilled and clecoed

Left front spar drilled and clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.