Brief Description: Pre Drill F1A&B to Left Inlet Floor and Bulkhead
The left reinforcement brackets F1A and F1B were pre-drilled on the workbench and then clamped in place and partially drilled to the left inlet floor and front bulkhead.
Left inlet reinforcement brackets drilled.
Left inlet reinforcement brackets drilled to inlet floor and front bulkhead