Brief Description: Rivet Interior 0.063 Strips to Channels
The next step was to join the two forward canopy frame channels by riveting them to the splice plate. The 0.063 flange strips were then clecoed and riveted to the flanges of the channels. The final step was to join the aft and forward channels by pop riveting the flanges of the aft channels to the 0.063 flange strips.