KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  10-20-2002
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Cleco & Drill Leading Edge to Wing

Once the leading edge was all clecoed together in the cradle it was just a matter of lifting it out and clecoing it to the front spar. Everything lined up perfectly. Once this was clecoed in place I match drilled the skins to the ribs and the front spar. The final thing for today was forming the coupler strip that will be used to connect the leading edge and the fuel tank. It was a tight fit sliding the strip between the inboard rib of the leading edge and the skin. I spent some time lining everything up and then clecoing and drilling this piece to the leading edge skin and inboard rib. Next up...the fuel tank.
' style=

Leading edge clecoed and drilled to wing

Leading edge clecoed and drilled to wing

' style=

Leading edge clecoed and drilled to wing

Leading edge clecoed and drilled to wing

' style=

Coupler plate clecoed and drilled to leading edge

Coupler plate clecoed and drilled to leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.