Brief Description: Rivet stiffeners, cleco/drill right elev
All of the skin stiffeners were back riveted to the skin. The skin was then placed in the 2x6 bending brake and the trailing edge was formed. I pushed just a little too hard. The bottom skin has some very small indentations were the top skin stiffeners along the trailing edge bumped into the bottom skin. I'm glad this is along the bottom and not the top. Once the trailing edge was formed, the entire right elevator was clecoed together and match drilled.