KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  12-24-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Sand / Clean / Prime Left Elevator

Today I sanded the left elevator, vacuumed out the pinholes, cleaned the surfaces with Acetone, filled the pinholes with Wonder-Fil, and then primed. Once the primer was dry I removed the masking, cleaned up the aluminum with Acetone and suspended left elevator from the ceiling with the other empennage parts.
' style=

Left elevator sanded, cleaned, pinholes filled, and ready for primer

Left elevator sanded, cleaned, pinholes filled, and ready for primer

' style=

Left elevator primed

Left elevator primed

' style=

Left elevator unmasked, cleaned, and ready to be stored away

Left elevator unmasked, cleaned, and ready to be stored away

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.