Brief Description: Final Prime Coat for Rudder Cable Fairings
In my last post I described all the final steps required to complete the Fairings for the Aft Rudder Cables. As I worked on the fairings, I accomplished the same steps to the fiberglass bottom of the rudder which also houses a white strobe light. These pictures show the completion of the multiple steps required to finish-prime these fiberglass pieces.