KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  6-26-2023
Number of Hours:  14.00
Manual Reference:  Sec 6, DWG 6
Brief Description:  Empennage Fairing Fiberglass Rebuild (Cont.)

I had about all the fun I could stand with this Empennage Fairing so went camping/boating for a couple of weeks. It was nice to get away but now comes the reality of attempting to get a perfect finish on this fairing. I marked all the areas that still had pinholes or needed additional shaping/finishing. Take a look at the pencil markings of all the areas that still need work. After two more times of filling/sanding, I have only two pinholes left. I’ll add straight epoxy with hardener and no microbeads; sand that small area; reprime with normal primer and call it as close to perfect as I can get it.
' style=

More Pinholes to Fill

More Pinholes to Fill

' style=

The Other Side Has as Much

The Other Side Has as Much

' style=

Final Fill, Sanding, and Primed

Final Fill, Sanding, and Primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.