KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  10-25-2023
Number of Hours:  20.00
Manual Reference:  N/A
Brief Description:  Multiple Layer Epoxy Process Nose Gear Fairing

It’s been several months since I updated my Kitlog. I continued the multiple layer epoxy process to remove pinholes on the Nose Gear Fairing and Wheel Pants. I also fixed flaws in the mating surfaces of the wheel pants and began to fabricate a tire-air-filling access door. The pictures below show some of the initial steps in this process.
' style=

Fixed Flaws in Mating Surfaces

Fixed Flaws in Mating Surfaces

' style=

Epoxy to Reinforce Bracing

Epoxy to Reinforce Bracing

' style=

Nose Fairing Layered Epoxy

Nose Fairing Layered Epoxy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.